A hobby. An independent overview compiled from public sources by a science and space enthusiast. I am not involved in these missions or facilities; my own work is detector electronics at European XFEL. My projects →

Facility · X-ray lasers

European XFEL

Where I work

Superconducting X-ray free-electron laser, up to 27,000 pulses per second

Status
Operating
Location
Schenefeld and Hamburg, Germany
Operator
European XFEL GmbH (12 member countries); accelerator operated by DESY
Next
User operation; facility upgrade in preparation

Summary

The world's largest X-ray free-electron laser: a 1.7 km superconducting linear accelerator at 17.5 GeV, trains of up to 2,700 pulses at an intra-train rate of 4.5 MHz, three SASE beamlines and seven instruments. This megahertz pulse structure is what made dedicated detectors necessary (AGIPD, LPD, DSSC, JUNGFRAU).

Now as of 4 Nov 2026

Back in user operation after its first long shutdown with a warm-up of the accelerator (LIMP, 2025). The restart was celebrated on 11 February 2026, and the user programme resumed in spring 2026 (idw). A new photoinjector, GUN5, was installed during the shutdown (DESY, lightsources.org). Preparations for a facility upgrade are under way; the public upgrade page describes the options being studied.

Key dates

  1. Sep 2017User operation beginsdone
  2. 2025LIMP, the first long shutdown with accelerator warm-updone
  3. 28 Jan 2026Nature paper: gain in an X-ray cavity (XFELO)done
  4. 11 Feb 2026Restart with the new GUN5 photoinjectordone

Results

  1. 28 Jan 2026XFELO: first demonstration of clean amplification of hard X-rays in a cavity (~66 m, diamond mirrors), a step towards an X-ray laser oscillator with a very narrow spectrum — CFEL; paper: Nature, 10.1038/s41586-025-10025-x

Timeline

  1. 11 Feb 2026Restart after LIMP — idw
  2. 28 Jan 2026Press release on XFELO — idw