Large research infrastructures on Earth: X-ray free-electron lasers, synchrotrons, gravitational-wave and neutrino observatories, telescopes, neutron sources and colliders.
- X-ray lasersOperatingEuropean XFELWhere I workSchenefeld and Hamburg, GermanyThe world's largest X-ray laser, whose megahertz pulse trains called for purpose-built detectors.
Next User operation; facility upgrade in preparation
- X-ray lasersOperatingFERMIBasovizza (Trieste), ItalyThe first seeded free-electron laser for users, now in the middle of its FERMI 2.0 upgrade.
Next FERMI 2.0 — schedule and funding not announced
- X-ray lasersOperatingFLASHHamburg, GermanyThe first soft X-ray laser on a superconducting accelerator and the technology prototype for European XFEL.
Next ≈ Dec 2026 – Jan 2027 first community experiments on the seeded FLASH1
- X-ray lasersUpgradeLCLS-IISLAC, Menlo Park, USAThe first hard X-ray laser, now upgrading its superconducting accelerator to higher energy.
Next early 2027 — superconducting linac restarts; 2027-10 — first light of LCLS-II-HE (plan)
- X-ray lasersOperatingPAL-XFELPohang, Republic of KoreaKorea's X-ray laser, now funding a second hard X-ray line.
Next 2026 funding for the second hard X-ray line HX2 has started; no start date announced
- X-ray lasersOperatingSACLAHarima (Hyogo Prefecture), JapanJapan's compact hard X-ray laser, the second in the world after LCLS.
Next ≈ Oct 2027 neighbouring SPring-8 shuts down for about a year (SPring-8-II); SACLA keeps running
- X-ray lasersCommissioningSHINEZhangjiang, Shanghai, ChinaThe third superconducting X-ray laser in the world, now in commissioning.
Next 2026–2027 first lasing (~200 eV, FEL-II line); end of 2027 — project completion
- X-ray lasersOperatingSwissFELVilligen, SwitzerlandPSI's compact X-ray laser, planning full coherence across hard and soft X-rays with SwissFELplus.
Next 2029–2032 SwissFELplus upgrade: seeding in the hard and soft X-ray ranges, preparation of a new line (plan)
- SynchrotronsOperatingALS-UBerkeley (California), USABerkeley's soft X-ray synchrotron, whose upgrade dark time has slipped twice.
Next Oct 2027 not before: ALS-U "dark time" begins (about 22 months)
- SynchrotronsOperatingAPS-UArgonne (Illinois), USAArgonne's synchrotron, rebuilt as what the laboratory calls the brightest in the world.
Next 2026–2027 beamlines return to science after the upgrade
- SynchrotronsOperatingDiamond-IIHarwell (Oxfordshire), United KingdomThe UK's national synchrotron, heading for an 18-month dark period to become Diamond-II.
Next Dec 2027 Diamond-II "dark period" begins (until 2029-06)
- SynchrotronsUpgradeElettra 2.0Basovizza (Trieste), ItalyTrieste's synchrotron, being rebuilt as a fourth-generation light source.
Next Jan 2027 commissioning of the new ring with beam begins
- SynchrotronsOperatingESRF-EBSGrenoble, FranceThe first high-energy fourth-generation synchrotron, the model for the upgrades that followed.
Next Feb 2027 (end) ID24-ED leaves the user programme (budget cut of €5 million a year)
- SynchrotronsCommissioningHEPSHuairou, Beijing, ChinaBeijing's new high-energy fourth-generation synchrotron, in trial operation with users.
Next ≈ Dec 2026 national acceptance and official start of operation (planned "within 2026")
- SynchrotronsOperatingMAX IVLund, SwedenThe first large multi-bend achromat ring, which set the course for every fourth-generation source.
Next Soft X-ray laser SXL — conceptual design ready, no decision to build
- SynchrotronsOperatingPETRA III/IVHamburg, GermanyHamburg's large synchrotron, waiting for a funding decision on its fourth-generation successor.
Next 2026–2027 BMFTR decision on funding PETRA IV (expected)
- SynchrotronsOperatingSLS 2.0Villigen, SwitzerlandPSI's synchrotron, back after its upgrade to a fourth-generation source.
Next 2026 (autumn) most beamlines open to users (PSI plan, not confirmed)
- SynchrotronsOperatingSOLEIL IISaint-Aubin (Paris-Saclay plateau), FranceFrance's synchrotron, preparing to shut down in 2028 for its ultra-low-emittance successor.
Next Oct 2028 SOLEIL shuts down; SOLEIL II "dark period" (about two years including commissioning)
- SynchrotronsOperatingSPring-8-IIHarima (Hyogo Prefecture), JapanJapan's large synchrotron, preparing a one-year shutdown to become a fourth-generation source.
Next ≈ Oct 2027 SPring-8 stops for about a year to install SPring-8-II (second half of Japanese fiscal year 2027)
- Gravitational wavesPlannedEinstein TelescopeCandidate sites: Meuse–Rhine (Belgium, Netherlands, Germany), Sardinia (Italy), Lusatia (Germany)Europe's planned underground gravitational-wave observatory; the site decision is coming.
Next end of 2026 — site bid books due; 2027 — site selection
- Gravitational wavesUpgradeLVKHanford and Livingston (USA), Cascina (Italy), Kamioka (Japan)The gravitational-wave network, between observing runs and about to start a six-month run.
Next late Oct to mid-Nov 2026 — six-month IR1 run starts (plan)
- NeutrinosUnder constructionDUNEFermilab (Illinois) to SURF (South Dakota), USAA 1,300 km neutrino experiment under construction in a former gold mine.
Next ≈ 2030 data taking begins (after delays)
- NeutrinosUnder constructionHyper-KKamioka, JapanSuper-Kamiokande's successor, eight times larger, racing DUNE to CP violation in neutrinos.
Next 2027 photomultiplier installation; 2028 — first data (plan)
- NeutrinosOperatingIceCubeSouth Pole, AntarcticaA cubic kilometre of Antarctic ice that discovered astrophysical neutrinos; Nobel Prize 2026.
Next First IceCube Upgrade data; Gen2 in planning
- NeutrinosOperatingJUNOJiangmen, Guangdong, ChinaThe largest liquid-scintillator neutrino detector, aiming at the neutrino mass ordering.
Next Data taking; mass ordering at ≥3σ is several years away
- NeutrinosData taking endedKATRINKIT, Karlsruhe, GermanyWeighing the neutrino directly; data taking is finished and the final analysis is under way.
Next Final result from the full data set (expected)
- NeutrinosUnder constructionKM3NeTMediterranean Sea, off Sicily (ARCA) and off Toulon (ORCA)Deep-sea neutrino telescopes, still being built, that caught the most energetic neutrino ever seen.
Next ARCA and ORCA construction continues; new analyses of KM3-230213A
- TelescopesOperatingRubinCerro Pachón, ChileStarted its ten-year survey of the southern sky in June 2026.
Next Data previews and first LSST science releases
- TelescopesUnder constructionSKAWestern Australia (SKA-Low) and the Karoo, South Africa (SKA-Mid); headquarters at Jodrell Bank, UKThe largest radio observatory under construction, on two continents.
Next First SKA-Mid image (expected)
- NeutronsCommissioningESSLund, Sweden (data centre in Copenhagen)The world's most powerful pulsed neutron source, preparing for its first neutrons.
Next 27 Jan 2027 first beam on target, first neutrons (plan)
- Particle physicsLong shutdownLHCCERN, Geneva (Switzerland and France)The largest collider, in a long shutdown to become the High-Luminosity LHC.
Next Jun 2030 HL-LHC starts (Run 4)